You need to warn production early to arrange something more than bins. It is amazing how much waste can be created by construction and how rarely production are aware of this fact no matter how often they have shot in studios. You can fill £500 worth of skip with a simple room set depending on the nature of the build and how neatly it is skipped. Bring it to everyone’s attention early, or you’ll be left with a big pile of problems and an angry studio manager.